Discussions with interesting people in public procurement across State, Local and Education in North America led by Dustin Lanier, Certified Public Procurement Officer and Founder of Civic Initiatives. Recognized as a top 10 procurement podcast by Feedspot. Find out more about Civic Initiatives at https://www.civicinitiatives.com
Public Procurement Change Agents
Evaluation and Negotiation - Public Procurement Chat 003 Part 2 - Q/A Session
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
An extended question answer period on evaluation and negotiation topics with questions involving Raj Sharma, Jennifer Sulentic, Warren Beardall and Victor Leamer to our procurement practitioners panel including Jaime Schorr, Jenny Hedderman, Jonathan Walker, and Christin Webb facilitated by Dustin Lanier, CPPO.
Hi, this is Dustin Lanier. Thanks for listening. Please find me on LinkedIn for original public sector operations content every week and please reach out to me if I and my team of procurement professionals at Civic Initiatives can help you be a public procurement change agent. I'm going to let the recording go for a little longer, and we'll see if we pick up anything interesting, and then I may or may not clip it. So Warren, Raj had actually raised his hand first, but I held off on bringing him up because I was trying to finish that portion. So let's go to Raj, who knows many of the people on, and then we'll come back to Warren. So hey, Raj, good afternoon.
SPEAKER_03Hi, Dustin. Hi, everyone. Thanks for having me up. Yeah, just a couple of points, just listening to the conversation. And all these points resonate. I was just going to add, I think one of the things from a negotiation standpoint I've advised on, even though I'm not working as much on these things anymore, is really understand the discriminators between the companies and And go back to what's most important. I think I forget who just highlighted, you know, if something goes wrong, right? How are you going to handle that? It's really important to know what are the most critical success factors. It goes back to the starting point of your requirements and outcomes and knowing that. What are the things that you need to make sure that you can deliver the outcome? And then look at the suppliers and say, you know, are there differentiators among the suppliers where some do it better than others for those key discriminators, right? And what I find is that a lot of times, I hear cost, schedule, performance. That bugs the hell out of me. Cost, schedule, performance as evaluation criteria. And that doesn't mean anything. And we know when you go deeper and then a lot of the criteria, if you have a supplier base where 80% of the capabilities are, let's say, roughly the same and they're generic and they're commoditized, but There are three factors that are potentially discriminators where suppliers differentiate themselves. then we need to think about which ones of those matter to us and our outcomes and really make sure that we take those into account and potentially weight them higher. So that's kind of the main thing that I wanted to add. And I could provide some examples if you like, but that's one thing. And then the second part really quick is doing your homework. I'm sure you all have talked about it. I just joined the room, but homework. You know, there's one quick example where, you know, many years ago, 18 years ago, I work, if you all remember gateway computers, you know, they were buying a lot of hard disk drives. One of the things we found in 10K reports for some of the suppliers was they had some aggressive targets to meet on sales that they had committed to on Wall Street. And we knew through other research that they weren't going to meet those. So we used that information as part of negotiation because we knew they had to hit those targets. So those nuggets are really important, but you do have to dig. So those are the two points, Dustin, I just wanted to make. Thank you.
SPEAKER_02Yeah, those are great. I do find, I do find, and in our, in our own practice where we're helping states with doing RFPs in certain areas, really trying to identify what are the differentiating requirements. So for example, if you're doing a bid that is in like a health and human space and someone says, well, these 120 things have to happen, or, you or people will die kind of things, those are very important. But if we weight those to where the four vendors in the space who can do that, all do that, then our evaluation points end up with 92.5, 93.4. And then, and then people, and then now we're arguing with vendors about why they, that they didn't get this quarter point or that quarter point. And so trying to say, these things are all the baseline. You have to have these to walk through the door. And then the evaluation is on the type of partner that you are with us. Right. And I think that is a different way of doing some of these solicitations. So any of the, any of the folks on the stage who haven't talked in a little while are how to, how do you try to incorporate differentiating kind of characteristics as opposed to just listing things that you know that everyone who is qualified does so that it overweights that part of the evaluation?
SPEAKER_01One thing in Louisiana, I've been hesitant to speak up about it because this isn't a raving endorsement for our process. But historically, we've been very prescriptive in our RFP criteria. Overly prescriptive is one of the things that I have been trying to correct. And as a result, I think we kind of negotiate ourselves away from the negotiating table. By being so prescriptive, there's not a whole lot to have the high stakes negotiation that Jamie was talking about. Part of that's because We may have scared some of the proposals away. Other ones have priced in the high cost of giving us exactly what we want with very few viable ways to get to that end goal. So that's something we've been mindful that we've experienced historically. To your question, Dustin, about how we balance the differentiators from the broad base of what should go into an effective solution. I think it goes back to what you were talking about earlier about adjectival is what does good look like and then what is the gap between above average and good or, you know, between above average and average or good and acceptable. And not only would we like a system that does X, we'd like it to be automated. We'd like it to have a reporting dashboard. We'd like it to have an analytics framework that our auditors can look at it. We'd like it to have an internal communication thing so we don't have to hunt for emails. Those are things that we talk about on the front end so that we have those differentiators. You don't want the evaluation criteria to strictly be the minimum criteria that goes into the system, but also things you can evaluate that are the value added differentiators.
SPEAKER_02So Warren, I know that you're in the UK and you and I have been in some rooms together and I know that you have some procurement background as well. So give a quick intro and then what do you have for our group today?
SPEAKER_00Yeah, thanks for inviting me up, Dustin. Yeah, okay, so yes, I am in the UK. My background's probably more construction than it is the broader procurement discussion we're having today, and I have advised... a number of government agencies on occasion on particularly insurance procurement and the sort of interface of all of that in wider construction engagements. But I am probably more often than not sitting the other side of the table on these things or at least advising the people that are. My question is, is born out of... hard learnt lessons over some 25 plus years of how different the end product can end up being to that that was originally being envisaged by both public sector and private sector in delivery so given the regularity in which that change can probably be expected in and around a lot of the areas of procurement I think we're talking about here. What do the panel consider to be the best means to have change in mind when both setting up and executing the evaluation process and the negotiation that may ensue but also set the agenda for the later period of time? in delivery of the project.
SPEAKER_06Hey, Dustin, this is Jamie. Just quickly, that made me think there's two books and resources that I wanted to throw out there. Obviously, I'm sure that most of us on the call have read Getting to Yes, right? It's just a classic negotiation book if you haven't read it. read it it's just fantastic around basic the foundational principles but Warren as you were talking made me think there's a British gentleman that I came across a few years ago his name is Scott Wayne and he owns Envoy out of Richmond Virginia and Canvas Studios he wrote a book called Cartography of Negotiation I think it's on Amazon really it just builds on the classic text of negotiation theory, and it's informed by real-life scenarios. Just a terrific, terrific read. So I just wanted to throw that out there.
SPEAKER_00The final one, I guess, from that is that I sometimes find that the robustness or the energy that's put into negotiation and the positioning that is then is actually setting a secondary agenda and a secondary culture, if you like, within the project that That is probably as important as winning that negotiation. And so I'm just curious to know, particularly in this context of change and change management, which I think is one of the single biggest risk factors. focuses in the actual execution of a project beyond its original evaluation. All of that together is what I'm curious to know how that sort of envisaged and thought about in the early stages of setting up the procurement set up on these deals.
SPEAKER_02You're seeing people try to do some deconstruction on the RFPs. So Jonathan mentioned you know, very prescriptive RFPs with a thousand requirements that don't leave any post change. We did a session on some agile procurement concepts a couple of weeks ago, like more solution-based type work. So, you know, we can try to pick up again on how evaluation negotiation drives there, but I think you're, you know, the whole thing, like how do you construct this these relationships so that they can anticipate that change will happen and how do you manage that change? It's certainly a topic that, again, could be talked about for days. Anybody have anything to chime in for Warren? Go
SPEAKER_04ahead, Jenny. One benefit we have under our regulations in Massachusetts under 801 CMR 21 is we have a section that says notwithstanding any of the language or what was in the procurement, the department has the ability to negotiate any item in the procurement. if it provides a better value than what was provided before. So it allows you to kind of navigate those changes that happen either at the vendor or at the department. If something that you initially had started with isn't working out and you want to fine tune it, but it prevents the vendor from making changes because it has to be negotiated. So that's a benefit and flexibility, kind of a window that we put into the procurement process to deal with those issues. The biggest, risk that we have or when the vendor ends up changing their systems or they lose people or they change their product. That's the biggest issue that we have, I think, when you're doing a procurement and then you implement and there are major changes that happen.
SPEAKER_02Let's come to Jennifer. Jennifer, say a quick hi and what do you have to contribute into our discussion?
SPEAKER_05Hi, everybody. I think most of the folks on the panel I have connected with. So glad to see everyone. And Dustin, thanks for having us all together today. Happy Wednesday. In my world, I align public procurement buyers with suppliers who have cooperative purchasing contracts that can add value and save money. And my question for the panel today is related to cooperative purchasing. Once you've determined that you're going to use cooperative purchasing, what requirements does your agency have for documenting the evaluation or negotiation process? And how does it differ when you're putting out your own solicitation?
SPEAKER_02So to keep context in that, like when... When an award is made, then a lot of the states have to have to say, well, what was the evaluation process that was done and so forth? So how does how do how do you guys have to validate if somebody else led something, whether their evaluation met your expectations? Have you guys had to deal with that in the process of choosing choosing what you use? It's probably somewhat more of a state question. So. I don't know if Jamie, Jonathan or Jenny have any feedback on how they, if they actually want to see something and how the evaluation was done or they just want to know that it was done. So Jamie, how do you guys deal with that?
SPEAKER_06Yeah. So our statute and our rules in our state require the state of Maine to participate in any cooperative RFP that we ultimately want to jump on a contract as a result of that RFP. But I think more to the question, question, Jennifer, is that the cost evaluation in the scoring has to be a minimum of 25% of the total scoring points. That's like the big criteria for us. We also look at the consensus scoring notes. We're flexible on individual notes. As long as there is 25% of cost, that's our number one driver. We will also look from a holistic perspective to make sure that obviously the specifications are the same as what we would want, that there's nothing in there that would violate like appeal processes or some of our other more secondary processes to the RFP. But again, that cost component is our number one.
SPEAKER_05And Jamie, great feedback. Thank you. And also, when you see that the cost component has met that 25%, do you guys do additional negotiations on top of that, or are you often just accepting the pricing and or any other benefits that come with that contract as is?
SPEAKER_06Yeah, we will always negotiate. If there's a way to bring the cost down and save the taxpayer dollar, then we will always negotiate.
SPEAKER_04Bravo! And this is Jenny. I would mirror exactly what Jamie said. In Massachusetts, they refer to it as collective purchasing. And our operational services division really has to review the source, whether it's a federal state or another public entity who's done the purchasing, and to make sure that it meets the minimum standards for Massachusetts and that there aren't any legal impediments, such as indemnification, where we would be assuming liability that we wouldn't normally under our own procurement. So there is a review process. And then if they do it, it still has to meet all the other terms under the procurement process. So it goes through the same process of review. It's just that they don't go through the procurement process because it's already been done. And departments are always encouraged to negotiate if they can. I
SPEAKER_03was going to add there that absolutely should be looking at them as a starting point if there are many. There's a lot of hard work already done. But a lot of the areas that I know I've been involved in lately are emerging technologies, emerging complex areas where there's, let's say, still emerging, even supplier bases are emerging. But even if they're not just so new, but let's say they've been around for a while, looking at the supplier base within the agreement and comparing it to, you know, if you did your own market research and looking at are the right set of suppliers included in the co-op. Because sometimes, you know, I think a lot of the leading co-ops have already figured that out and on-ramp, off-ramp, et cetera. So they're always keeping the supplier base current. But that's an important thing where we've found in our research that, you know, some of the suppliers that you really want on there, they might be really well-constructed contracts, but do they have the right set of suppliers and is there a way to maintain the supply base current? So that's – I'm not sure if anyone has incorporated that. I'm sure you have. But any perspective on that?
SPEAKER_02Well, you – You said FedRAMP, but you didn't say StateRAMP. So, Jamie, I'll put a softball on the tee for you. Tell us about StateRAMP and how you're trying to use that to accomplish some of these topics.
SPEAKER_06Oh, my gosh, Dustin, I thought you'd never ask. So we have actually a StateRAMP webinar coming up this afternoon to NASPO members. I've been working with StateRAMP, which is a nonprofit organization cybersecurity standard processing group, right? It's very similar to FedRAMP, but it's not FedRAMP, it's StateRAMP. So there are different cybersecurity levels when we're evaluating. Do you need a level one, level two, level three, right? Depending on the PII or PHI. And it's a review process for vendors to participate in StateRAMP And when a state puts out an RFP, we can say, okay, you have to have a level two state ramp certification for cybersecurity. And that means something. It means that you've had a third party assessing agency come in and review your system, your cybersecurity. And the absolute glorious, glorious thing about state ramp is that it brings a standardization in the evaluation process that can be applicable to to all 50 states, right? And that is just something that We don't have very often. So Raj, I think, you know, StateRamp will take us, you know, to the next level in standardization around cybersecurity. And it's just another tool in the toolkit, which is available not only for state government, it's for municipalities, et cetera. I would highly encourage anybody, if you don't know about StateRamp yet, we're just getting going, right? The train is leaving the station. It's moving pretty fast. Check out stateramp.org. And if my email address is on LinkedIn or you can Google me, shoot me an email. I'm happy to get you additional information.
SPEAKER_03I'm already looking it up. Thanks.
SPEAKER_02Jenny, this is your, you're not procurement as such. You're kind of like spanned across a couple of areas, but I know this is an, that cybersecurity is an area of yours. Have you touched the state ramp stuff yet? Or are you aware of it?
SPEAKER_04Yes, aware of it. I actually was in the process of, messaging Jamie to get more information. But I think the security aspects, especially with SolarWinds and all of these other issues that are coming up, are really going to be the emerging issues that we're dealing with in procurement over the next couple of years. Just because you're not just buying your systems to do your operational needs, but you also have to make sure you're meeting the privacy and security requirements for those systems if they're managing data or critical operation. So this is a huge issue, I think, for everybody that will be facing. Jenny out.
SPEAKER_02Well, and that brings me to kind of the natural close of this conversation or in the direction of it is, you know, talking about future topics. So I think, you know, Jamie, if you're talking about some of those and Jenny, you have some touch, then There's also some CIOs on this app, like the Georgia CIO is on. And I mean, I'm a former deputy CIO as well. So I wanted to try to bridge us into being able to hit on some different topics. So I don't know, maybe we pick up something around security and procurement. What do you guys think? Jamie, is that an interesting topic to you? We can tie interstate ramp stuff.
SPEAKER_06So this is the only downside of Clubhouse is that you can't see me doing the happy dance behind the scenes, but yes. IT and procurement, yeah, they go hand in hand. It's such a critical component and something that procurement officers are challenged with every day. We should be having the conversations.
SPEAKER_02Well, we'll see. I have these buttons on my Rodecaster, so I can... Oh, did that not work? Wait, hold on. See, I have an applause button. So, okay. So we'll do that as a topic. I think also there was some discussion about... debriefing process, which maybe we tie into something a little bit broader. We didn't really talk about power in negotiation today, which I think is a really interesting topic. So there's an author called, let me get his name right here, Patrick Henry Hansen, who I attended one of his things he did once where he was teaching buyers about where their power is versus where the seller's power is. And so that really is kind of its whole own topic about negotiation that I'm interested in carrying forward. So in general, for the Public Sector Innovators Group, and if you haven't joined yet, please join. I want to program around public procurement, but also come into some other areas. So were there any other... Panel, was there any other topic that spawned up today I should capture that we try to carry forward into another one? Jonathan, please.
SPEAKER_01Yeah, we didn't talk too much about it today, but one thing that I think is a natural fit and goes well with the discussion about cybersecurity and procurement is the idea of external standards in general in procurement, like the idea of not reinventing the wheel, using the NIST standard that's out there, or using price indexes, again, instead of trying to reinvent the wheel.
SPEAKER_04And that's such a great point. Jonathan, thank you for bringing that up because what we're finding is that in the audit world for government, There are a lot of auditors that are now focusing on doing IT and cyber audits. And it's kind of a new emerging area of the audit because they have to make sure that the data is reliable in the systems that are pulling at least the financial information. So that's kind of all over the place. And if a state does not have a standard to do this review, it puts them at risk that auditors are going to be identifying the standard. And that's difficult for a lot of governments. We have standards, so we're working on that. But this is going to be a really big emerging issue on the audit, government audit side. Right. And
SPEAKER_01it's not just useful in cybersecurity. The example that I had in the back of my mind, but there's probably a dozen other use cases, is document shredding. So whenever we did our very first document shredding contract eight years ago or something, we were pulling out our documents. ruler and was like, wait, so what's a fair millimeter measurement? You know, we want no more than four millimeters in this dimension and two millimeters in this dimension, and we think that's sufficient because, you know, they would never be able to see more than three letters at a time. You know, and then we were nearing the end. We were just about to publish the bid, and it was like, Somebody said, oh, you didn't want to use the NIST standard for shredding that's out there? We were kicking ourselves, you know, that it never occurred to ourselves that there was a national standard that we could reference, and any vendor out there that was worth their salt would not only recognize that standard, but would be able to articulate it and implement it better than we could even ask for it.
SPEAKER_02Right, and I mean, you know, ISO 9000 type stuff as a cliche, right? But there's a lot of things in that stack. There's a lot of things in... there's an ITIL stack that has tons of stuff in it. I think we have to be careful not to keep people out if they're not currently certified. But if we can point to some of those and say that or demonstrate an equivalent practice, I think there is a very interesting discussion that can be that can be had there. So, um, well, I think that, um, you know, our question answer period was good. So I'm going to keep it as a, as its own, I'll do it as a second podcast. And I feel like it was generally all in the box. I'd try to make sure that the panel feels, you know, that we're, we're keeping it within stuff that they can comment on. So, um, I appreciate y'all's continued participation. And then if you're listening to this on podcasts and you're interested in how clubhouse actually works and getting on, please contact me. I have ways to be able to deal with it. Well, I can't end now if Victor just came in at the very last second. So let me see if Victor wants to come and say hello for one second. Victor, we were talking. Victor is a senior buyer with Spokane. Now I'm having a brain. Victor, introduce yourself real quick.
SPEAKER_03Quite all right.
SPEAKER_02What's your county again? Spokane? Spokane.
SPEAKER_03Not Spokane, but Spokane.
SPEAKER_02Spokane. Like a Nevada, Nevada thing.
SPEAKER_03Oh, yeah. Tomato.
SPEAKER_02Educated. Drop a knowledge bomb for us here at the last minute. We're talking about evaluation and negotiation. What's something that when you teach, I know you teach about these topics. Give us something that you teach on in evaluation and negotiation to take us out.
SPEAKER_03Well, for both, I would say when it comes to alerting your students Your evaluation team, also your supplier world, you got to make sure what you're doing is clearly spelled out in the RFP. You can't make this up on the fly. If you want everyone to know in advance what's required of them, what's the evaluation process, what's open to negotiation, what do they need to prepare in their document to say we have concerns about this, you got to spell it out. My two cardinal roles, and I say this every time, when there's an issue, what does the RFP say? And two, if it's not in the RFP, it does not exist.
SPEAKER_02See, now I'll use another button on my Rodecaster. Here we go. That was a knowledge bomb. You came in at the end with a knowledge bomb, Victor. So we're wrapping so that I can have both our upfront session and our question session be about 30 minutes so that it's sumable by people with the podcast, which is Public Procurement Change Agents. Hi, this is Dustin Lanier. Thanks for listening. Please find me on LinkedIn for original public sector operations content every week. And please reach out to me if I and my team of procurement professionals at Civic Initiatives can help you be a public procurement change agent.